Docs: close the M21 track (events + system power)
docs/m19-m20-plan.md's M21 preview now points at the completed plan.
This commit is contained in:
parent
a785efa4a3
commit
446f655c69
|
|
@ -189,24 +189,8 @@ suspend/resume — a future *lifecycle-vocabulary* extension, since "suspend"
|
|||
has the shape of a signal every driver must answer, and it has no consumer
|
||||
until laptop sleep); CPU P/C-states.
|
||||
|
||||
## M21 preview — ACPI events + system power (planned next, not in this loop)
|
||||
## M21 — ACPI events + system power — DONE
|
||||
|
||||
The acpi service grows the event side (settled direction 2026-07-13; detailed
|
||||
phases when M20 lands):
|
||||
|
||||
- **21.1 SCI + fixed events**: irq_bind the SCI (the resource M20.1 already
|
||||
records), read/clear PM1 status, publish the power-button event to
|
||||
subscribers (the same pub/sub shape the manager uses).
|
||||
- **21.2 GPE + Notify**: Notify dispatch in the shared AML interpreter, GPE
|
||||
block handling, `Notify(device, code)` published per reported node. The
|
||||
acpi service is a **bus** here: battery (PNP0C0A), AC (ACPI0003), and lid
|
||||
(PNP0C0D) nodes are reported children; small class drivers bind them and
|
||||
speak an evaluate/subscribe protocol to the service — the xHCI split,
|
||||
repeated. The embedded controller (`_Qxx` queries) rides this phase;
|
||||
QEMU emulates no battery/EC, so those paths are interface-complete and
|
||||
validated on real hardware (the laptop is the win condition), while the
|
||||
plumbing is proven by the power button.
|
||||
- **21.3 the capstone**: QEMU `system_powerdown` → acpi service event → init
|
||||
runs the M17 stop sequence over its children → kernel `\_S5` — orderly
|
||||
shutdown as the scenario that proves lifecycle + events compose. (The
|
||||
harness grows a QMP poke to inject the event.)
|
||||
Built and merged (docs/m21-plan.md, 2026-07-13): the SCI + power button, Notify/GPE
|
||||
dispatch, and orderly shutdown (init's stop cascade into a ring-3 S5 write).
|
||||
See that plan for the phase record.
|
||||
|
|
|
|||
Loading…
Reference in New Issue