Commit Graph
3 Commits
Author SHA1 Message Date
Daniel Samson 79d859a111 The xHCI driver scans its root-hub ports and reports the tree (M18.2)
child_added/child_removed join the device-manager protocol. The driver
maps its register BAR (resource 0 is the ECAM config space; the walk
starts at 1), reads CAPLENGTH and HCSPARAMS1, and reads one PORTSC per
port: the connect bit and speed class come straight from hardware, no
rings needed to see the devices. The manager mirrors reported children
keyed by (parent, port), remembers which instance reported each, and
prunes a dead reporter's children before deciding the restart — the
children describe protocol state that died with the process. The
usb-report scenario drives the whole loop: two QEMU devices reported,
reporter killed, children pruned, driver respawned with backoff, and the
new instance re-claims, re-scans, and re-reports.
2026-07-13 00:28:29 +01:00
Daniel Samson 3cc1d38dd0 The device manager supervises: hello, backoff, and the crash-loop cap (M18.1)
The manager is now a harness service on the well-known .device_manager
endpoint. Every driver spawns supervised; drivers with an assignment must
hello (device-manager-protocol, versioned) within a deadline enforced by
a timer sweep. Exit reasons drive the restart decision: clean exits stay
down, faults restart with 300/600/1200ms backoff, and three fast deaths
mark a driver failed instead of respawning forever. usb-xhci-bus is the
first conforming driver; the crash-test fixture claims a device, hellos,
and faults on purpose — each respawn re-proving claim release on death
through the manager's own path. maximum_tasks grows 16 -> 32: the
initial-ramdisk sweep (15 binaries at once) was intermittently
overflowing the static pool.
2026-07-13 00:19:30 +01:00
Daniel Samson 116b8f6c41 Design the process lifecycle and the device manager (M17-M18)
Signals over IPC (POSIX concepts, message delivery), published exit events,
the stable runtime.process interface, and the device manager as tree +
matcher + supervisor. All open questions settled; docs/m17-m18-plan.md is
the phase-by-phase execution plan.
2026-07-12 22:56:34 +01:00